Publicar

Anh ba Cong | COLE
Anh ba Cong | COLE
Paraguay will not renew cheap power deals past Dec 31, 2027, proposing a 700 MW auction cap shared with AI from 2028 that cuts miner capacity from 944 MW to under 560 MW. This energy reallocation directly pressures operating margins for HIVE (77% capacity exposed) and global BTC hashrate flows. DYOR. $BTC

Aviso legal: o conteúdo do OKX Orbit é fornecido apenas para fins informativos. Saber mais

Respostas

Ainda sem comentários. Sê a primeira pessoa a responder!